A SELECTION OF MAJOR INDUSTRIAL PROJECTS
UNDERTAKEN BY DELTA'T'

Year

Site

Approx value

Duration
(weeks)

Details

1981

BP Chemicals

184,000

Over 26 week period

Heat up and maintain acetic acid line in highly corrosive atmosphere Zone - 1

1983

Fawley

14,000

9

Auxiliary Boiler fuel oil lines, intercabling & control centres.

1984

Stowmarket

30,000

12

Resin pipelines/all intercabling Zone 1 area

1985

Elstree Blood Labs

28,000

Over 20 week period

Tracing of caustic liquor pipelines - Zone 1 area

1986

BP Espana Tenerife

175,000

26

Internal traced pipelines with heat-up facility

1986

Hatfield Tunnel

48,000

13

Frost protection essential water supply and fire mains inc. thermal insulation.

1987

Lashham Oilfield

100,000

6 week deadline penalty clause

E.T.H. system inc. intercabling against tight time schedule.

1988

Dover Docks

87,000

2 stages over 29 weeks

Ice/Snow protection on access ramps inc. auto control systems.

1990

BP Espana Gran Canaria

400,000

26

Internally traced pipelines Zone 1 area.

1990

BP Isle of Grain

400,000

40

Raise/maintain temp. 12" NB bitumen pipes approx 2 km long. Part in Zone 1 area.

1990

Monsanto Newport

90,000

8

Raise/maintain temp. of various bore pipelines inc. complete monitoring system - Zone 2 hazardous area.

1991

South Quay

104,000

30

Frost protection of essential water supplies.

1992

CIBA Geigy

300,000

40

Maintain temp. of pipelines and vessels in Zone 1 hazardous area complete with computerised control system.

1993

Salt End Hull

110,000

On going term contract

Temperature maintenance of acid lines in Zone 1 hazardous area T3.

1993

Brigg CCGT

120,000

22

Frost protection of water and steam pipework. withstanding ternps up to 520°C.

1993

Eastman Chemicals Hartlepool

40,000

2 - deadline

Upgrading of existing trace heating from non-hazardous to Zone 1 area.

1993

Little Barford'C' Power Station

100,000

8

Frost protection of water and steam pipework withstanding tcmps up to 538°C.

1993

Newton Aycliffe

60,000

10

Frost protection of Process Plant.

1994

Newcastle

25,000

-

Turbine generator stator heaters.

1994

Hull

36,000

2 shutdown

Jetty No. 1 Process.

1994

Keadby Power Station

32,000

8

Frost protection of fire fighting pipework.

1994

Little Barford Power Station

63,000

20

Frost protection instrument pipework.

1994

Barking Reach CCGT

70,000

20

Boiler pipework frost protection.

1994

Barking Reach CCGT

410,000

24

Trace heating and Control/ Monitoring.

1994

Gas Plant, Holland

31,000

4

Process Frost protection.

1995

Hull

15,000

4

Acetic Acid Plant.

1995

Mobil Oil

18,000 value

3

New CHP Plant frost protection

1996

Hydro Polymers

162,000

24

Frost protection of essential water pipes in Zone 1 area. plus cable schedules.

1996

Iggesund Board CHP

80,000

12

Frost protection water and boiler pipework.

1996

Crossness STW

44,000

20

Temperature maintenance of hoppers & ducting.

1996

Beckton STW

72,000

20

Temperature maintenance of hoppers & ducting.

1996

Barclaycard

20,000

3

Car Park, ramp heating

1996

Uzbekestan

52,000

4

Frost protection of water pipework.

1996

Belfast

25,000

6

Trace heating fuel oil pipework in Zone 1 hazardous area.

1996

Didcot CCGT

36,000

-

Steam pipework boilers and power cabling.

1997

China

40,000

6

Supply of 72 sets of hopper heating equipment.

1997

Seal Sands CHP

22,000

6

Frost protection of pipework.

1997

Courtaulds

110,000

2 - window

Process heating project incl.high tech computer interlocked control system - overall management of all sub-contract disciplines.

1997

Wm Lee

34,000

4

Turnkey package Hopper and ductwork

1997

Immingham

26,000

2

Acetic acid turnkey contract

1997

Immingham

32,000

2

Acetic acid turnkey contract

1997

Conoco

27,000

6

CHP Plant-Boiler pipework & power cabling.

1997

Dronfield Sand Plant

20,000

2

Frost protection of CW pipework and thermal insulation.

1997

Beckton

72,000

20

Temp. maintenance (160°C) of Hoppers, Cyclones, Conveyors & Ducting.

1997

Crossness

44,000

16

Temp. maintenance (160°C) of Hoppers, Cyclones, Conveyors & Ducting.

1997

R. R. Derby

180,000

10

CHP Plant Boiler & balance of Plant Pipework.

1998

Scabank CHP

42,000

6

Frost protection of Pipework.

1998

Saltend

160,000

4

Trace Heating for temperature maintenance in Zone 1 hazardous area.

1999

Sutton Bridge

150,000

10

CHP Plant Boiler & balance of Plant Pipework