1981 |
BP Chemicals |
184,000 |
Over 26 week period |
Heat up and maintain acetic acid line in highly corrosive atmosphere Zone - 1 |
|
1983 |
Fawley |
14,000 |
9 |
Auxiliary Boiler fuel oil lines, intercabling & control centres. |
|
1984 |
Stowmarket |
30,000 |
12 |
Resin pipelines/all intercabling Zone 1 area |
|
1985 |
Elstree Blood Labs |
28,000 |
Over 20 week period |
Tracing of caustic liquor pipelines - Zone 1 area |
|
1986 |
BP Espana Tenerife |
175,000 |
26 |
Internal traced pipelines with heat-up facility |
|
1986 |
Hatfield Tunnel |
48,000 |
13 |
Frost protection essential water supply and fire mains inc. thermal insulation. |
|
1987 |
Lashham Oilfield |
100,000 |
6 week deadline penalty clause |
E.T.H. system inc. intercabling against tight time schedule. |
|
1988 |
Dover Docks |
87,000 |
2 stages over 29 weeks |
Ice/Snow protection on access ramps inc. auto control systems. |
|
1990 |
BP Espana Gran Canaria |
400,000 |
26 |
Internally traced pipelines Zone 1 area. |
|
1990 |
BP Isle of Grain |
400,000 |
40 |
Raise/maintain temp. 12" NB bitumen pipes approx 2 km long. Part in Zone 1 area. |
|
1990 |
Monsanto Newport |
90,000 |
8 |
Raise/maintain temp. of various bore pipelines inc. complete monitoring system - Zone 2 hazardous area. |
|
1991 |
South Quay |
104,000 |
30 |
Frost protection of essential water supplies. |
|
1992 |
CIBA Geigy |
300,000 |
40 |
Maintain temp. of pipelines and vessels in Zone 1 hazardous area complete with computerised control system. |
|
1993 |
Salt End Hull |
110,000 |
On going term contract |
Temperature maintenance of acid lines in Zone 1 hazardous area T3. |
|
1993 |
Brigg CCGT |
120,000 |
22 |
Frost protection of water and steam pipework. withstanding ternps up to 520°C. |
|
1993 |
Eastman Chemicals Hartlepool |
40,000 |
2 - deadline |
Upgrading of existing trace heating from non-hazardous to Zone 1 area. |
|
1993 |
Little Barford'C' Power Station |
100,000 |
8 |
Frost protection of water and steam pipework withstanding tcmps up to 538°C. |
|
1993 |
Newton Aycliffe |
60,000 |
10 |
Frost protection of Process Plant. |
|
1994 |
Newcastle |
25,000 |
- |
Turbine generator stator heaters. |
|
1994 |
Hull |
36,000 |
2 shutdown |
Jetty No. 1 Process. |
|
1994 |
Keadby Power Station |
32,000 |
8 |
Frost protection of fire fighting pipework. |
|
1994 |
Little Barford Power Station |
63,000 |
20 |
Frost protection instrument pipework. |
|
1994 |
Barking Reach CCGT |
70,000 |
20 |
Boiler pipework frost protection. |
|
1994 |
Barking Reach CCGT |
410,000 |
24 |
Trace heating and Control/ Monitoring. |
|
1994 |
Gas Plant, Holland |
31,000 |
4 |
Process Frost protection. |
|
1995 |
Hull |
15,000 |
4 |
Acetic Acid Plant. |
|
1995 |
Mobil Oil |
18,000 value |
3 |
New CHP Plant frost protection |
|
1996 |
Hydro Polymers |
162,000 |
24 |
Frost protection of essential water pipes in Zone 1 area. plus cable schedules. |
|
1996 |
Iggesund Board CHP |
80,000 |
12 |
Frost protection water and boiler pipework. |
|
1996 |
Crossness STW |
44,000 |
20 |
Temperature maintenance of hoppers & ducting. |
|
1996 |
Beckton STW |
72,000 |
20 |
Temperature maintenance of hoppers & ducting. |
|
1996 |
Barclaycard |
20,000 |
3 |
Car Park, ramp heating |
|
1996 |
Uzbekestan |
52,000 |
4 |
Frost protection of water pipework. |
|
1996 |
Belfast |
25,000 |
6 |
Trace heating fuel oil pipework in Zone 1 hazardous area. |
|
1996 |
Didcot CCGT |
36,000 |
- |
Steam pipework boilers and power cabling. |
|
1997 |
China |
40,000 |
6 |
Supply of 72 sets of hopper heating equipment. |
|
1997 |
Seal Sands CHP |
22,000 |
6 |
Frost protection of pipework. |
|
1997 |
Courtaulds |
110,000 |
2 - window |
Process heating project incl.high tech computer interlocked control system - overall management of all sub-contract disciplines. |
|
1997 |
Wm Lee |
34,000 |
4 |
Turnkey package Hopper and ductwork |
|
1997 |
Immingham |
26,000 |
2 |
Acetic acid turnkey contract |
|
1997 |
Immingham |
32,000 |
2 |
Acetic acid turnkey contract |
|
1997 |
Conoco |
27,000 |
6 |
CHP Plant-Boiler pipework & power cabling. |
|
1997 |
Dronfield Sand Plant |
20,000 |
2 |
Frost protection of CW pipework and thermal insulation. |
|
1997 |
Beckton |
72,000 |
20 |
Temp. maintenance (160°C) of Hoppers, Cyclones, Conveyors & Ducting. |
|
1997 |
Crossness |
44,000 |
16 |
Temp. maintenance (160°C) of Hoppers, Cyclones, Conveyors & Ducting. |
|
1997 |
R. R. Derby |
180,000 |
10 |
CHP Plant Boiler & balance of Plant Pipework. |
|
1998 |
Scabank CHP |
42,000 |
6 |
Frost protection of Pipework. |
|
1998 |
Saltend |
160,000 |
4 |
Trace Heating for temperature maintenance in Zone 1 hazardous area. |
|
1999 |
Sutton Bridge |
150,000 |
10 |
CHP Plant Boiler & balance of Plant Pipework |